Closed
Two drains opposite 6&8 Northall Road Eaton bray
Reported via mobile in the Drains/Ditches Blocked category anonymously at 19:47, Tue 18 June 2024
Sent to Central Bedfordshire Council less than a minute later. Council ref: 408233.
Both drains have silted up after the recent flooding along Northall Road (22/5/24). Today's rain (15/6/24) did not readily drain away causing the road to be awash. Concerned that failing to clear the silted drains may result in repeated flooding if we have repeated excessive rainfall.
Updates
-
State changed to: Investigating
Updated by Central Bedfordshire Council at 19:47, Tue 18 June 2024
-
Result of overnight rain.13/6/24. Road now under water.
[ This update contains a photo, see: https://fixmystreet.centralbedfordshire.gov.uk/ photo/ c/ 15257938.0.full.jpeg?675ed51b ]
State changed to: Open
Posted by Central Bedfordshire Council at 08:19, Wed 19 June 2024
-
Still has not drained. All storm water drains full / overflowing up to The Comp junction. Comp drainage ditch full.
[ This update contains a photo, see: https://fixmystreet.centralbedfordshire.gov.uk/ photo/ c/ 15273997.0.full.jpeg?c6a5f4d7 ]
State changed to: Open
Posted by Central Bedfordshire Council at 19:04, Wed 19 June 2024
-
Thank you for contacting us with information relating to a Highways issue. This gully/gullies have been programmed for routine cleansing which will be taking place in the near future. http://www.centralbedfordshire.gov.uk/ transport/ report/ gully-cleaning.aspx
State changed to: Closed
Posted by Central Bedfordshire Council at 14:38, Tue 30 July 2024
This report is now closed to updates from the public. You can make a new report in the same location.