Drains outside 9 Bedford Avenue

Reported via iOS in the Flooded Property category anonymously at 07:45, Mon 23 September 2024

Sent to Central Bedfordshire Council less than a minute later. Council ref: 411829.

Drains in street outside property blocked and flooding. As a result the house was surrounded by floodwater last night and some ingress into garage. Flooding repeating at lower level this morning. We know that a contributor to this is failure to carry out regular maintenance of these drains, which we believe are of the soakaway type and take water from the whole street. The recent heavy rain will have brought further silt to block the drains completely, so now the issue is urgent. Please get drains cleared today as due to the silting, this mornings lighter rain is causing flooding on our property as once the drains are blocked it has nowhere else to go. Thank you.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • State changed to: Investigating

    Updated by Central Bedfordshire Council at 07:45, Mon 23 September 2024

  • Your street drains are causing flooding on our property again tonight. The rain is light to moderate, so it is clear that something has gone wrong. Please provide your plan to remedy the problem.

    Posted anonymously at 03:19, Fri 27 September 2024

  • Your street drains are causing flooding on our property again tonight. The rain is light to moderate, so it is clear that something has gone wrong. Please provide your plan to remedy the problem.

    State changed to: Open

    Posted by Central Bedfordshire Council at 10:35, Mon 30 September 2024

  • Thank you for your Highways report.
    An order has now been raised to rectify the identified issue and this will now be added to our programme of works. We are, unfortunately, unable to provide you with a timescale for this work to be completed, however, all repairs are prioritised using an assessment matrix in line with our Network Maintenance Management Plan (NMMP)

    We will continue to monitor all defects to ensure the safety of our residents as part of the NMMP which can be found online - http://www.centralbedfordshire.gov.uk/ transport/ roads-strategies/ highways-asset-management.aspx

    Many thanks,
    Central Bedfordshire Council Highways

    State changed to: Action scheduled

    Posted by Central Bedfordshire Council at 08:58, Thu 3 October 2024