You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

A507 approx 100m before Lidlington turn

Reported via mobile in the Signs category anonymously at 16:07, Sunday 8 June 2025

Sent to Central Bedfordshire Council less than a minute later. Council ref: 423862.

The damaged direction sign indicates right turn from A507 towards Lidlington has been hit by a vehicle . The bottom half of the sun has twisted and is hanging on by one bracket. It is a large piece of metal that is swinging in the wind and when large vehicles pass. It is a danger to road users. It has been reported previously but I don't think the existing hazard has been appreciated. This needs to be inspected and actioned.

Updates

  • State changed to: Investigating

    Updated by Central Bedfordshire Council at 16:07, Sunday 8 June 2025

  • Thank you for submitting your Highways report.
    We already have maintenance work planned in for this area and the issue will be resolved as part of this work. We are, unfortunately, unable to provide you with a timescale for this to be completed, however, all repairs are prioritised using an assessment matrix in line with our Network Maintenance Management Plan (NMMP).

    We will continue to monitor all defects to ensure the safety of our residents as part of the NMMP which can be found online - http://www.centralbedfordshire.gov.uk/ transport/ roads-strategies/ highways-asset-management.aspx

    Many thanks,
    Central Bedfordshire Council Highways

    State changed to: Closed

    Posted by Central Bedfordshire Council at 08:12, Monday 9 June 2025

  • Email from resident :

    I made a report about a damaged sign . This sign has already been reported by others on 2 occasions. On both occasions your reply was the standard .
    "We already have maintenance work planned in for this area and the issue will be resolved as part of this work. I recd the same response to the report I made on Sunday
    My report however was that the sign is actually dangerous and a part of the sign is hanging by one bracket.

    This is not acceptable and does not meet basic safety standards as the defect has not been inspected.

    State changed to: Open

    Posted by Central Bedfordshire Council at 15:20, Monday 16 June 2025

  • Thank you for submitting your Highways report.
    We already have maintenance work planned in for this area and the issue will be resolved as part of this work. We are, unfortunately, unable to provide you with a timescale for this to be completed, however, all repairs are prioritised using an assessment matrix in line with our Network Maintenance Management Plan (NMMP).

    We will continue to monitor all defects to ensure the safety of our residents as part of the NMMP which can be found online - http://www.centralbedfordshire.gov.uk/ transport/ roads-strategies/ highways-asset-management.aspx

    Many thanks,
    Central Bedfordshire Council Highways

    State changed to: Closed

    Posted by Central Bedfordshire Council at 12:40, Tuesday 24 June 2025

  • Customer email forwarded to PO and HL team.

    State changed to: Open

    Posted by Central Bedfordshire Council at 15:12, Wednesday 25 June 2025


  • Hello, This job has been scheduled for 3rd July as the extra long posts have arrived in the depot in this week. I will cary on driving past the sign 3 times a weeks to check until the work is complete.

    Thank you for submitting your Highways report.
    We already have maintenance work planned in for this area and the issue will be resolved as part of this work. We are, unfortunately, unable to provide you with a timescale for this to be completed, however, all repairs are prioritised using an assessment matrix in line with our Network Maintenance Management Plan (NMMP).

    We will continue to monitor all defects to ensure the safety of our residents as part of the NMMP which can be found online - http://www.centralbedfordshire.gov.uk/ transport/ roads-strategies/ highways-asset-management.aspx

    Many thanks,
    Central Bedfordshire Council Highways

    State changed to: Closed

    Posted by Central Bedfordshire Council at 13:46, Thursday 26 June 2025

  • Thank you for submitting your Highways report.

    Hello, This has been rebooked for 11/7

    We already have maintenance work planned in for this area and the issue will be resolved as part of this work. We are, unfortunately, unable to provide you with a timescale for this to be completed, however, all repairs are prioritised using an assessment matrix in line with our Network Maintenance Management Plan (NMMP).

    We will continue to monitor all defects to ensure the safety of our residents as part of the NMMP which can be found online - http://www.centralbedfordshire.gov.uk/ transport/ roads-strategies/ highways-asset-management.aspx

    Many thanks,
    Central Bedfordshire Council Highways

    Posted by Central Bedfordshire Council at 13:31, Friday 4 July 2025

This report is now closed to updates from the public. You can make a new report in the same location.