Back to all reports

Outside 14A Church Street close to lamp post

Reported via desktop in the Road Surface category anonymously at 10:33, Sat 23 August 2025

Sent to Central Bedfordshire Council less than a minute later. Council ref: 426674.

As the previous report - Council ref: 420798 has been closed with no further action, although you advise it will be monitored. A second request was made Council ref: 421291 and a temporary repair was completed on the instructions of the visiting engineer.

I have to report that the relatively recent temporary repair has failed and we are therefore back in the same situation. This pothole is constantly full of water, even though for some time we have had minimal rain and therefore any temporary repair is not going to last long. Other large repairs in this same area are constantly wet and these areas seem to be increasing in size. The water on the surface has been a problem for some years now and is causing the road surface to deteriorate. Clearly the problem is not going away and needs resolving.

As previously highlighted when traffic passes through this particular pothole there is an almighty thud, which is amplified when larger vehicles i.e. lorries or buses pass and is being experience by residence on both sides of the road..

This fault is also obstructing legitimate off road parking for the residence.

The water within the hole is showered approx. 5 feet in the air and over a similar area every time a vehicle drives through it. This not only showers unexpected pedestrians with dirty water, but also covers the cars parked locally with the same water and stones from the repair. This road is in constant use by pedestrians and traffic, as it is a main route through the village. With the extensive work being carried out in the village and diversions in place means the traffic using Church Street has increased considerably.

Note: Road surfacing and line painting of the road was planned recently, but was cancelled at short notice. Could this be a result of a pending investigation!

It would be appreciate if you could give a priority to the repair of this hole and help in progressing and resolving this problem.

Thank you

Updates

  • State changed to: Investigating

    Updated by Central Bedfordshire Council at 10:33, Sat 23 August 2025

  • Update on your report:

    After inspecting the reported issue, I can confirm that an order has been raised for this defect to be repaired, which we anticipate will be carried out within the next 12 weeks, subject to weather conditions and emergencies.

    Many thanks,
    Central Bedfordshire Council - Highways

    State changed to: Closed

    Posted by Central Bedfordshire Council at 12:57, Wed 27 August 2025

This report is now closed to updates from the public. You can make a new report in the same location.