You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Outside 50/52 High Street Flitton MK45 5DY

Reported via desktop in the Road Surface category anonymously at 18:42, Thursday 14 May 2026

Sent to Central Bedfordshire Council less than a minute later. Council ref: 13542.

The temporary repair (3/2/2026) to the 'pothole' has now disintegrated resulting in a very uneven surface. Added to this is the fact that this section of road has been resurfaced a number of times, culminating in a large section of uneven/crumbling road surface. There are large dips in the road surface and with each vehicle passing vehicle there is constant (due to volume of traffic) vibrations and excessive/unacceptable noise level. There is a major concern regarding potential damage to adjacent/adjoining property from vibrations, as vehicles pass over this stretch of road. All of my windows and doors shake as vehicles travel over this stretch of road. As this is a bus route, plus a high level of HGV's using it daily, the problem is escalating. There is also the risk to road users, especially those travelling at speed, who are at risk of losing control of their vehicle on this stretch of road. This stretch of road is crumbling and will eventually collapse.

Updates

  • State changed to: Investigating

    Updated by Central Bedfordshire Council at 18:42, Thursday 14 May 2026

  • Update on your report:

    After inspecting the reported issue, our officers have determined that this doesn't currently qualify as a priority for repair. We will continue to monitor the defect during future inspections and carry out works should it meet our intervention levels in future.

    With over 1,400km of road to maintain across Central Bedfordshire, we have to prioritise the work we do as detailed in our Network Maintenance Management Plan (NMMP), which can be viewed on the following page of our website https://www.centralbedfordshire.gov.uk/ info/ 55/ transport_roads_and_parking/ 592/ roads_strategies

    Many thanks,
    Central Bedfordshire Council - Highways

    State changed to: No further action

    Posted by Central Bedfordshire Council at 08:45, Thursday 21 May 2026

This report is now closed to updates from the public. You can make a new report in the same location.